    {"id":3441,"date":"2021-03-13T07:07:00","date_gmt":"2021-03-13T07:07:00","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/proyecto-de-central-hidroelectrica-ampliada-de-tri-an\/"},"modified":"2023-11-17T14:17:12","modified_gmt":"2023-11-17T14:17:12","slug":"proyecto-de-central-hidroelectrica-ampliada-de-tri-an","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/proyecto-de-central-hidroelectrica-ampliada-de-tri-an\/","title":{"rendered":"Proyecto de central hidroel\u00e9ctrica ampliada de Tri An"},"content":{"rendered":"<p>En 2020, el proyecto de la central hidroel\u00e9ctrica ampliada de Tri An acord\u00f3 implementar la tecnolog\u00eda BIM en sus operaciones, tras ser elegido como proyecto piloto BIM con el Programa Global de Infraestructuras del Reino Unido. El proyecto pretende demostrar la eficacia de BIM, que se espera implementar de forma generalizada en la mayor empresa el\u00e9ctrica del pa\u00eds, Vietnam Electricity.<\/p>\n<p><a href=\"http:\/\/nangluongvietnam.vn\/news\/en\/electricity\/signing-loi-for-bim-application-at-the-tri-an-extended-hpp.html\" target=\"_blank\" rel=\"noopener\">http:\/\/nangluongvietnam.vn\/news\/en\/electricity\/signing-loi-for-bim-application-at-the-tri-an-extended-hpp.html<\/a><\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[9],"info-country":[53],"info-level":[102],"info-region":[21],"info-type":[35,179],"info-state":[85],"class_list":["post-3441","info-collection","type-info-collection","status-publish","hentry","info-category-capability-capacity-building","info-country-vietnam","info-level-project-level","info-region-asia","info-type-case-study","info-type-pilot","info-state-implementing"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"13 March 2021","category_list":{"info-category":[{"term_id":9,"name":"Capability &amp; Capacity Building","slug":"capability-capacity-building","term_group":0,"term_taxonomy_id":9,"taxonomy":"info-category","description":"","parent":0,"count":152,"filter":"raw"}],"info-country":[{"term_id":53,"name":"Vietnam","slug":"vietnam","term_group":0,"term_taxonomy_id":53,"taxonomy":"info-country","description":"","parent":0,"count":37,"filter":"raw"}],"info-level":[{"term_id":102,"name":"Project Level","slug":"project-level","term_group":0,"term_taxonomy_id":102,"taxonomy":"info-level","description":"","parent":0,"count":26,"filter":"raw"}],"info-region":[{"term_id":21,"name":"Asia","slug":"asia","term_group":0,"term_taxonomy_id":21,"taxonomy":"info-region","description":"","parent":0,"count":259,"filter":"raw"}],"info-type":[{"term_id":35,"name":"Case Study","slug":"case-study","term_group":0,"term_taxonomy_id":35,"taxonomy":"info-type","description":"","parent":0,"count":50,"filter":"raw"},{"term_id":179,"name":"Pilot","slug":"pilot","term_group":0,"term_taxonomy_id":179,"taxonomy":"info-type","description":"","parent":0,"count":5,"filter":"raw"}],"info-state":[{"term_id":85,"name":"Implementing","slug":"implementing","term_group":0,"term_taxonomy_id":85,"taxonomy":"info-state","description":"","parent":0,"count":252,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/capability-capacity-building\/\" alt=\"Capability &amp; Capacity Building\" class=\"info-category-capability-capacity-building\">Capability &amp; Capacity Building<\/a> ","info-country":"<a href=\"https:\/\/globalbim.org\/news\/info-country\/vietnam\/\" alt=\"Vietnam\" class=\"info-country-vietnam\">Vietnam<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/project-level\/\" alt=\"Project Level\" class=\"info-level-project-level\">Project Level<\/a> ","info-region":"<a href=\"https:\/\/globalbim.org\/news\/info-region\/asia\/\" alt=\"Asia\" class=\"info-region-asia\">Asia<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/case-study\/\" alt=\"Case Study\" class=\"info-type-case-study\">Case Study<\/a> <a href=\"https:\/\/globalbim.org\/news\/info-type\/pilot\/\" alt=\"Pilot\" class=\"info-type-pilot\">Pilot<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/implementing\/\" alt=\"Implementing\" class=\"info-state-implementing\">Implementing<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3441"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3441"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3441"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3441"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3441"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3441"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3441"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3441"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}