    {"id":3520,"date":"2022-01-17T16:53:00","date_gmt":"2022-01-17T16:53:00","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/plan-de-ejecucion-bim\/"},"modified":"2023-11-17T14:16:51","modified_gmt":"2023-11-17T14:16:51","slug":"plan-de-ejecucion-bim","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/plan-de-ejecucion-bim\/","title":{"rendered":"Plan de ejecuci\u00f3n BIM"},"content":{"rendered":"<p>El equipo BIM de la Agencia de Carreteras y Tr\u00e1nsito (Agentschap Wegen en Verkeer, AWV) es responsable de la elaboraci\u00f3n de los documentos de compromiso BIM necesarios, como el protocolo BIM y el plan de ejecuci\u00f3n BIM. El plan de ejecuci\u00f3n BIM para proyectos de infraestructura se ha elaborado gracias a los conocimientos y la informaci\u00f3n de los proyectos piloto BIM de la AWV. El protocolo BIM belga, elaborado por el Comit\u00e9 T\u00e9cnico BIM y TIC del Instituto Belga de Investigaci\u00f3n de la Construcci\u00f3n (BBRI), tambi\u00e9n fue una fuente de inspiraci\u00f3n para la realizaci\u00f3n del plan de ejecuci\u00f3n BIM<\/p>\n<p>El plan de ejecuci\u00f3n BIM, centrado en proyectos de infraestructura, pretende ofrecer directrices pr\u00e1cticas para la adopci\u00f3n de BIM en los proyectos. Las directrices generales para una colaboraci\u00f3n orientada a BIM se incluyen en el protocolo BIM de AWV; el plan de ejecuci\u00f3n BIM espec\u00edfico del proyecto examina m\u00e1s de cerca los aspectos pr\u00e1cticos de la colaboraci\u00f3n BIM. Los requisitos, especificaciones y acuerdos pr\u00e1cticos del plan de ejecuci\u00f3n BIM s\u00f3lo se aplican al proyecto o contrato espec\u00edfico. Tambi\u00e9n es t\u00edpico de un plan de ejecuci\u00f3n BIM que los acuerdos pr\u00e1cticos puedan actualizarse durante el proyecto, si fuera necesario.<\/p>\n<p><a href=\"https:\/\/wegenenverkeer.be\/zakelijk\/documenten?search=uitvoeringsplan\" target=\"_blank\" rel=\"noopener\">https:\/\/wegenenverkeer.be\/zakelijk\/documenten?search=uitvoeringsplan<\/a><\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[8],"info-country":[57],"info-level":[16,102],"info-region":[19],"info-type":[25,34],"info-state":[84],"class_list":["post-3520","info-collection","type-info-collection","status-publish","hentry","info-category-collaborative-framework","info-country-belgium","info-level-organisational-level","info-level-project-level","info-region-europe","info-type-guidance","info-type-template-or-tool","info-state-developing"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"17 January 2022","category_list":{"info-category":[{"term_id":8,"name":"Collaborative Framework","slug":"collaborative-framework","term_group":0,"term_taxonomy_id":8,"taxonomy":"info-category","description":"","parent":0,"count":420,"filter":"raw"}],"info-country":[{"term_id":57,"name":"Belgium","slug":"belgium","term_group":0,"term_taxonomy_id":57,"taxonomy":"info-country","description":"","parent":0,"count":14,"filter":"raw"}],"info-level":[{"term_id":16,"name":"Organisational level","slug":"organisational-level","term_group":0,"term_taxonomy_id":16,"taxonomy":"info-level","description":"","parent":0,"count":67,"filter":"raw"},{"term_id":102,"name":"Project Level","slug":"project-level","term_group":0,"term_taxonomy_id":102,"taxonomy":"info-level","description":"","parent":0,"count":26,"filter":"raw"}],"info-region":[{"term_id":19,"name":"Europe","slug":"europe","term_group":0,"term_taxonomy_id":19,"taxonomy":"info-region","description":"","parent":0,"count":563,"filter":"raw"}],"info-type":[{"term_id":25,"name":"Guidance","slug":"guidance","term_group":0,"term_taxonomy_id":25,"taxonomy":"info-type","description":"","parent":0,"count":367,"filter":"raw"},{"term_id":34,"name":"Template or Tool","slug":"template-or-tool","term_group":0,"term_taxonomy_id":34,"taxonomy":"info-type","description":"","parent":0,"count":170,"filter":"raw"}],"info-state":[{"term_id":84,"name":"Developing","slug":"developing","term_group":0,"term_taxonomy_id":84,"taxonomy":"info-state","description":"","parent":0,"count":662,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/collaborative-framework\/\" alt=\"Collaborative Framework\" class=\"info-category-collaborative-framework\">Collaborative Framework<\/a> ","info-country":"<a href=\"https:\/\/globalbim.org\/news\/info-country\/belgium\/\" alt=\"Belgium\" class=\"info-country-belgium\">Belgium<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/organisational-level\/\" alt=\"Organisational level\" class=\"info-level-organisational-level\">Organisational level<\/a> <a href=\"https:\/\/globalbim.org\/news\/info-level\/project-level\/\" alt=\"Project Level\" class=\"info-level-project-level\">Project Level<\/a> ","info-region":"<a href=\"https:\/\/globalbim.org\/news\/info-region\/europe\/\" alt=\"Europe\" class=\"info-region-europe\">Europe<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/guidance\/\" alt=\"Guidance\" class=\"info-type-guidance\">Guidance<\/a> <a href=\"https:\/\/globalbim.org\/news\/info-type\/template-or-tool\/\" alt=\"Template or Tool\" class=\"info-type-template-or-tool\">Template or Tool<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/developing\/\" alt=\"Developing\" class=\"info-state-developing\">Developing<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3520"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3520"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3520"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3520"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3520"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3520"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3520"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}