    {"id":3527,"date":"2022-01-18T12:45:00","date_gmt":"2022-01-18T12:45:00","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/informe-de-escenarios-futuros-de-la-efca-2021\/"},"modified":"2023-11-17T14:17:04","modified_gmt":"2023-11-17T14:17:04","slug":"informe-de-escenarios-futuros-de-la-efca-2021","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/informe-de-escenarios-futuros-de-la-efca-2021\/","title":{"rendered":"Informe de escenarios futuros de la EFCA 2021"},"content":{"rendered":"<p>La Federaci\u00f3n Europea de Asociaciones de Consultores de Ingenier\u00eda (EFCA) ha publicado un informe titulado &#8220;Which way to go? Strategic scenarios for consulting engineers in times of high uncertainty&#8221; (\u00bfQu\u00e9 camino tomar? Escenarios estrat\u00e9gicos para ingenieros consultores en tiempos de gran incertidumbre), dirigido a los l\u00edderes empresariales que toman decisiones cr\u00edticas en tiempos dif\u00edciles, como tras la pandemia mundial de Covid19. El Comit\u00e9 de Tendencias Futuras de la EFCA, junto con el Centro de Estrategia y Planificaci\u00f3n de Escenarios de la Escuela Superior de Gesti\u00f3n HHL de Leipzig, explor\u00f3 el futuro y examin\u00f3 posibles desarrollos estrat\u00e9gicos.<\/p>\n<p>Una forma de orientarse en tiempos de incertidumbre es partir de escenarios que muestren c\u00f3mo podr\u00eda desarrollarse el futuro de formas completamente distintas. El informe describe cuatro escenarios para el sector de la consultor\u00eda, basados en &#8220;incertidumbres cr\u00edticas&#8221;.<\/p>\n<p>Aunque las tecnolog\u00edas digitales han puesto de cabeza muchos de nuestros procesos y comportamientos laborales, ya no se consideran &#8220;inciertos&#8221;. Sabemos que tenemos que seguir adelante con la digitalizaci\u00f3n. De lo que somos menos conscientes, o al menos, menos capaces de aceptar como un impacto directo en nuestro rendimiento, es de la mezcla de retos externos: la amenaza diaria del cambio clim\u00e1tico, el sobreendeudamiento y los sistemas financieros mundiales altamente presionados, una Uni\u00f3n Europea cada vez m\u00e1s discordante, incluso la guerra, los conflictos y los refugiados que afectan a nuestras fronteras. Estos problemas pueden afectar directa y conjuntamente a los ingenieros consultores. Pero, \u00bfc\u00f3mo? El futuro es confuso y la visibilidad escasa. \u00bfD\u00f3nde acabar\u00e1n los cambios? \u00bfQu\u00e9 tendencias resultar\u00e1n decisivas para evaluar el futuro? \u00bfC\u00f3mo ser\u00e1 nuestro sector dentro de cinco a\u00f1os? \u00bfQu\u00e9 impulsores clave ser\u00e1n formativos para nuestro mercado? \u00bfC\u00f3mo pueden nuestras empresas mantener el \u00e9xito en un entorno cambiante? Estas preguntas no son f\u00e1ciles de responder en un mundo cada vez m\u00e1s vol\u00e1til, incierto, complejo y ambiguo. Este informe pretende destacar algunos escenarios potenciales que pueden darse en el futuro en relaci\u00f3n con estos retos.<\/p>\n<p><a href=\"https:\/\/www.efca.be\/sites\/default\/files\/2021-11\/EFCA%20Future%20Scenarios%20Report%202021.pdf\" target=\"_blank\" rel=\"noopener\">https:\/\/www.efca.be\/sites\/default\/files\/2021-11\/EFCA%20Future%20Scenarios%20Report%202021.pdf<\/a><\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[9],"info-country":[],"info-level":[17],"info-region":[19],"info-type":[29],"info-state":[82],"class_list":["post-3527","info-collection","type-info-collection","status-publish","hentry","info-category-capability-capacity-building","info-level-regional-level","info-region-europe","info-type-evidence-and-analysis","info-state-justifying"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"18 January 2022","category_list":{"info-category":[{"term_id":9,"name":"Capability &amp; Capacity Building","slug":"capability-capacity-building","term_group":0,"term_taxonomy_id":9,"taxonomy":"info-category","description":"","parent":0,"count":152,"filter":"raw"}],"info-country":false,"info-level":[{"term_id":17,"name":"Regional level","slug":"regional-level","term_group":0,"term_taxonomy_id":17,"taxonomy":"info-level","description":"","parent":0,"count":30,"filter":"raw"}],"info-region":[{"term_id":19,"name":"Europe","slug":"europe","term_group":0,"term_taxonomy_id":19,"taxonomy":"info-region","description":"","parent":0,"count":563,"filter":"raw"}],"info-type":[{"term_id":29,"name":"Evidence and Analysis","slug":"evidence-and-analysis","term_group":0,"term_taxonomy_id":29,"taxonomy":"info-type","description":"","parent":0,"count":70,"filter":"raw"}],"info-state":[{"term_id":82,"name":"Justifying","slug":"justifying","term_group":0,"term_taxonomy_id":82,"taxonomy":"info-state","description":"","parent":0,"count":107,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/capability-capacity-building\/\" alt=\"Capability &amp; Capacity Building\" class=\"info-category-capability-capacity-building\">Capability &amp; Capacity Building<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/regional-level\/\" alt=\"Regional level\" class=\"info-level-regional-level\">Regional level<\/a> ","info-region":"<a href=\"https:\/\/globalbim.org\/news\/info-region\/europe\/\" alt=\"Europe\" class=\"info-region-europe\">Europe<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/evidence-and-analysis\/\" alt=\"Evidence and Analysis\" class=\"info-type-evidence-and-analysis\">Evidence and Analysis<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/justifying\/\" alt=\"Justifying\" class=\"info-state-justifying\">Justifying<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3527"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3527"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3527"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3527"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3527"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3527"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3527"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}