    {"id":3584,"date":"2022-03-07T11:48:00","date_gmt":"2022-03-07T11:48:00","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/requisitos-de-los-ferrocarriles-estatales-para-el-modelado-de-informacion\/"},"modified":"2023-11-17T14:16:55","modified_gmt":"2023-11-17T14:16:55","slug":"requisitos-de-los-ferrocarriles-estatales-para-el-modelado-de-informacion","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/requisitos-de-los-ferrocarriles-estatales-para-el-modelado-de-informacion\/","title":{"rendered":"Requisitos de los ferrocarriles estatales para el modelado de informaci\u00f3n"},"content":{"rendered":"<p>Norwegian State Railways (Bane NOR) es una empresa estatal responsable de la infraestructura ferroviaria nacional, sujeta al Ministerio de Transportes y Comunicaciones. Su objetivo es proporcionar infraestructuras ferroviarias accesibles y servicios eficientes y f\u00e1ciles de usar, incluido el desarrollo de nudos y terminales de mercanc\u00edas. Bane NOR es responsable de la planificaci\u00f3n, desarrollo, gesti\u00f3n, operaci\u00f3n y mantenimiento de la red ferroviaria nacional, la gesti\u00f3n del tr\u00e1nsito y la gesti\u00f3n y desarrollo de la propiedad ferroviaria. Tiene la responsabilidad de la coordinaci\u00f3n operativa de los trabajos de seguridad y la responsabilidad operativa de la gesti\u00f3n de crisis. Est\u00e1 iniciando un programa de mejora para estandarizar las entregas y el flujo de informaci\u00f3n de los proyectos de desarrollo en el momento de su traspaso a la organizaci\u00f3n operativa. El prop\u00f3sito de este documento de requisitos es especificar qu\u00e9 informaci\u00f3n se producir\u00e1 y proporcionar\u00e1 en relaci\u00f3n con los entregables de un importante proyecto vial\/ferroviario reciente (FRE16). Era un requisito previo que la informaci\u00f3n creada en el marco de este proyecto pudiera ser gestionada y explotada en una fase posterior por Bane NOR y las aplicaciones operativas de las organizaciones de carreteras. La informaci\u00f3n deb\u00eda entregarse con el fin de establecer un est\u00e1ndar con el que la industria pudiera trabajar en futuros proyectos. Adem\u00e1s, el contratista es responsable de proporcionar la documentaci\u00f3n necesaria junto con los entregables, y de conformidad con el Contrato. El documento de requisitos abarca las siguientes especificaciones: Definiciones Requisitos de las estructuras modelo Requisitos de contenido informativo sobre objetos en modelos, relacionados con el trabajo y la entrega.<\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[8],"info-country":[46],"info-level":[16],"info-region":[19],"info-type":[25,91],"info-state":[84,85],"class_list":["post-3584","info-collection","type-info-collection","status-publish","hentry","info-category-collaborative-framework","info-country-norway","info-level-organisational-level","info-region-europe","info-type-guidance","info-type-standards","info-state-developing","info-state-implementing"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"7 March 2022","category_list":{"info-category":[{"term_id":8,"name":"Collaborative Framework","slug":"collaborative-framework","term_group":0,"term_taxonomy_id":8,"taxonomy":"info-category","description":"","parent":0,"count":420,"filter":"raw"}],"info-country":[{"term_id":46,"name":"Norway","slug":"norway","term_group":0,"term_taxonomy_id":46,"taxonomy":"info-country","description":"","parent":0,"count":24,"filter":"raw"}],"info-level":[{"term_id":16,"name":"Organisational level","slug":"organisational-level","term_group":0,"term_taxonomy_id":16,"taxonomy":"info-level","description":"","parent":0,"count":67,"filter":"raw"}],"info-region":[{"term_id":19,"name":"Europe","slug":"europe","term_group":0,"term_taxonomy_id":19,"taxonomy":"info-region","description":"","parent":0,"count":563,"filter":"raw"}],"info-type":[{"term_id":25,"name":"Guidance","slug":"guidance","term_group":0,"term_taxonomy_id":25,"taxonomy":"info-type","description":"","parent":0,"count":367,"filter":"raw"},{"term_id":91,"name":"Standards","slug":"standards","term_group":0,"term_taxonomy_id":91,"taxonomy":"info-type","description":"","parent":0,"count":185,"filter":"raw"}],"info-state":[{"term_id":84,"name":"Developing","slug":"developing","term_group":0,"term_taxonomy_id":84,"taxonomy":"info-state","description":"","parent":0,"count":662,"filter":"raw"},{"term_id":85,"name":"Implementing","slug":"implementing","term_group":0,"term_taxonomy_id":85,"taxonomy":"info-state","description":"","parent":0,"count":252,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/collaborative-framework\/\" alt=\"Collaborative Framework\" class=\"info-category-collaborative-framework\">Collaborative Framework<\/a> ","info-country":"<a href=\"https:\/\/globalbim.org\/news\/info-country\/norway\/\" alt=\"Norway\" class=\"info-country-norway\">Norway<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/organisational-level\/\" alt=\"Organisational level\" class=\"info-level-organisational-level\">Organisational level<\/a> ","info-region":"<a href=\"https:\/\/globalbim.org\/news\/info-region\/europe\/\" alt=\"Europe\" class=\"info-region-europe\">Europe<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/guidance\/\" alt=\"Guidance\" class=\"info-type-guidance\">Guidance<\/a> <a href=\"https:\/\/globalbim.org\/news\/info-type\/standards\/\" alt=\"Standards\" class=\"info-type-standards\">Standards<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/developing\/\" alt=\"Developing\" class=\"info-state-developing\">Developing<\/a> <a href=\"https:\/\/globalbim.org\/news\/info-state\/implementing\/\" alt=\"Implementing\" class=\"info-state-implementing\">Implementing<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3584"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3584"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3584"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3584"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3584"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3584"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3584"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}