    {"id":3617,"date":"2022-11-30T15:07:50","date_gmt":"2022-11-30T15:07:50","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/bim-en-la-legislacion-y-la-normativa\/"},"modified":"2023-11-17T14:17:06","modified_gmt":"2023-11-17T14:17:06","slug":"bim-en-la-legislacion-y-la-normativa","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/bim-en-la-legislacion-y-la-normativa\/","title":{"rendered":"BIM en la legislaci\u00f3n y la normativa"},"content":{"rendered":"<p>BIM Loket trabaja para conseguir un sector en el que trabajar con BIM y normas abiertas sea lo habitual. Para ello, es necesario desarrollar la informaci\u00f3n y la capacitaci\u00f3n relacionadas con BIM para mejorar la cualificaci\u00f3n del sector y aumentar la capacidad de cumplir estos requisitos. El sitio web de BIM Loket contiene mucha informaci\u00f3n y documentaci\u00f3n de apoyo, como este informe orientativo sobre BIM en la legislaci\u00f3n y la normativa. El proyecto que dio lugar al informe titulado &#8220;Espacio para el BIM en la legislaci\u00f3n y la normativa&#8221;, explora las posibilidades e imposibilidades dentro de las leyes y normativas para la aplicaci\u00f3n de BIM como m\u00e9todo de trabajo uniforme\/est\u00e1ndar. En primer lugar, la investigaci\u00f3n se centra en el uso de datos\/archivos BIM a la hora de solicitar el permiso medioambiental dentro de la pr\u00e1ctica de permisos existente. La principal conclusi\u00f3n del estudio es que los obst\u00e1culos de la legislaci\u00f3n vigente impiden una aplicaci\u00f3n satisfactoria de BIM. Por lo tanto, las inversiones en BIM por parte del sector de la construcci\u00f3n tienen un menos beneficios empresariales y sociales e incluso conllevan costos y requisitos de tiempo adicionales para los clientes y las empresas constructoras. El horizonte temporal de este informe basado en la exploraci\u00f3n de oportunidades para BIM en la legislaci\u00f3n y la normativa es de 3 a\u00f1os. Algunas de las preguntas que se plantean en el informe son las siguientes: \u00bfcu\u00e1l es la legislaci\u00f3n y los reglamentos vigentes m\u00e1s f\u00e1ciles de aplicar, \u00bfcu\u00e1l es la urgencia y cu\u00e1les son las posibilidades concretas para BIM en la legislaci\u00f3n y los reglamentos en este per\u00edodo? Esta agenda estrat\u00e9gica podr\u00eda incorporarse sin problemas a la Agenda de la Construcci\u00f3n y podr\u00eda realizarse en los 4 a\u00f1os del actual Gobierno. La principal conclusi\u00f3n del estudio es que las inversiones en BIM por parte del sector de la construcci\u00f3n tienen menos beneficios comerciales y sociales y, por el contrario, conllevan costos y tiempo adicionales para los clientes y las empresas constructoras de lo que ser\u00eda posible si se eliminaran los obst\u00e1culos a BIM en la legislaci\u00f3n vigente. Gran parte de los obst\u00e1culos actuales al uso de BIM en toda la cadena, desde la iniciativa y el dise\u00f1o hasta el uso, la gesti\u00f3n y el mantenimiento, se encuentran en la legislaci\u00f3n y los reglamentos vigentes, especialmente en la Ley Ministerial de Regulaci\u00f3n Medioambiental (MOR) de la WABO. El MOR bloquea el uso de BIM en la solicitud del permiso medioambiental. En parte debido a esto, se carece de un incentivo fuerte para que la autoridad competente para el permiso medioambiental y, en particular, los municipios se preparen para recibir datos BIM (especialmente modelos IFC) del proceso de permiso y la reutilizaci\u00f3n de estos datos BIM para otros objetivos pol\u00edticos. La mayor\u00eda de los municipios apenas parecen prepararse a\u00fan para BIM. En la encuesta realizada (una muestra de empresas constructoras que trabajan con BIM), el sector de la construcci\u00f3n indica que se le est\u00e1 instando a eliminar este bloqueo y, en particular, a a\u00f1adir IFC a la lista de formatos permitidos para adjuntar a la solicitud del permiso medioambiental. Adem\u00e1s, el estudio ha trazado las oportunidades para BIM en la Ley de Garant\u00eda de Calidad para la Construcci\u00f3n (WKB) y en la Ley de Gobierno Digital.<\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[9],"info-country":[112],"info-level":[14],"info-region":[19],"info-type":[29,32],"info-state":[82,83],"class_list":["post-3617","info-collection","type-info-collection","status-publish","hentry","info-category-capability-capacity-building","info-country-netherlands","info-level-national-level","info-region-europe","info-type-evidence-and-analysis","info-type-legal-contractual","info-state-justifying","info-state-mobilising"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"30 November 2022","category_list":{"info-category":[{"term_id":9,"name":"Capability &amp; Capacity Building","slug":"capability-capacity-building","term_group":0,"term_taxonomy_id":9,"taxonomy":"info-category","description":"","parent":0,"count":152,"filter":"raw"}],"info-country":[{"term_id":112,"name":"Netherlands","slug":"netherlands","term_group":0,"term_taxonomy_id":112,"taxonomy":"info-country","description":"","parent":0,"count":48,"filter":"raw"}],"info-level":[{"term_id":14,"name":"National level","slug":"national-level","term_group":0,"term_taxonomy_id":14,"taxonomy":"info-level","description":"","parent":0,"count":741,"filter":"raw"}],"info-region":[{"term_id":19,"name":"Europe","slug":"europe","term_group":0,"term_taxonomy_id":19,"taxonomy":"info-region","description":"","parent":0,"count":563,"filter":"raw"}],"info-type":[{"term_id":29,"name":"Evidence and Analysis","slug":"evidence-and-analysis","term_group":0,"term_taxonomy_id":29,"taxonomy":"info-type","description":"","parent":0,"count":70,"filter":"raw"},{"term_id":32,"name":"Legal &amp; Contractual","slug":"legal-contractual","term_group":0,"term_taxonomy_id":32,"taxonomy":"info-type","description":"","parent":0,"count":44,"filter":"raw"}],"info-state":[{"term_id":82,"name":"Justifying","slug":"justifying","term_group":0,"term_taxonomy_id":82,"taxonomy":"info-state","description":"","parent":0,"count":107,"filter":"raw"},{"term_id":83,"name":"Mobilising","slug":"mobilising","term_group":0,"term_taxonomy_id":83,"taxonomy":"info-state","description":"","parent":0,"count":243,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/capability-capacity-building\/\" alt=\"Capability &amp; Capacity Building\" class=\"info-category-capability-capacity-building\">Capability &amp; Capacity Building<\/a> ","info-country":"<a href=\"https:\/\/globalbim.org\/news\/info-country\/netherlands\/\" alt=\"Netherlands\" class=\"info-country-netherlands\">Netherlands<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/national-level\/\" alt=\"National level\" class=\"info-level-national-level\">National level<\/a> ","info-region":"<a href=\"https:\/\/globalbim.org\/news\/info-region\/europe\/\" alt=\"Europe\" class=\"info-region-europe\">Europe<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/evidence-and-analysis\/\" alt=\"Evidence and Analysis\" class=\"info-type-evidence-and-analysis\">Evidence and Analysis<\/a> <a href=\"https:\/\/globalbim.org\/news\/info-type\/legal-contractual\/\" alt=\"Legal &amp; Contractual\" class=\"info-type-legal-contractual\">Legal &amp; Contractual<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/justifying\/\" alt=\"Justifying\" class=\"info-state-justifying\">Justifying<\/a> <a href=\"https:\/\/globalbim.org\/news\/info-state\/mobilising\/\" alt=\"Mobilising\" class=\"info-state-mobilising\">Mobilising<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3617"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3617"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3617"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3617"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3617"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3617"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3617"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}