    {"id":3822,"date":"2022-03-02T15:18:00","date_gmt":"2022-03-02T15:18:00","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/lo-digital-en-la-ingenieria-y-la-construccion-el-poder-transformador-del-modelado-de-informacion-para-la-construccion\/"},"modified":"2023-11-17T14:17:07","modified_gmt":"2023-11-17T14:17:07","slug":"lo-digital-en-la-ingenieria-y-la-construccion-el-poder-transformador-del-modelado-de-informacion-para-la-construccion","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/lo-digital-en-la-ingenieria-y-la-construccion-el-poder-transformador-del-modelado-de-informacion-para-la-construccion\/","title":{"rendered":"Lo digital en la ingenier\u00eda y la construcci\u00f3n: El poder transformador del modelado de informaci\u00f3n para la construcci\u00f3n"},"content":{"rendered":"<p>on unos ingresos anuales de casi 10 billones de d\u00f3lares, es decir, alrededor del 6% del PIB mundial, la industria de la ingenier\u00eda y la construcci\u00f3n es la piedra angular de la econom\u00eda mundial. El sector est\u00e1 maduro para el cambio: la productividad laboral en la construcci\u00f3n lleva d\u00e9cadas estancada y las empresas han tardado en adaptarse a los nuevos retos e innovar. Sin embargo, todo el sector est\u00e1 a punto de transformarse gracias a las tecnolog\u00edas digitales, con BIM a la cabeza. Digital in Engineering and Construction: The Transformative Power of Building Information Modeling (Lo digital en la ingenier\u00eda y la construcci\u00f3n: El poder transformador del modelado de informaci\u00f3n para la construcci\u00f3n) se elabor\u00f3 para explicar que las empresas individuales que ignoren la transformaci\u00f3n digital tendr\u00e1n dificultades para sobrevivir. Para los adoptantes, la velocidad importa: solo hay un estrecho margen de tiempo durante el cual una perspectiva digital inteligente proporciona una ventaja competitiva significativa sobre el participante medio de la industria. Este informe esboza los principales avances tecnol\u00f3gicos que pronto transformar\u00e1n el sector de la ingenier\u00eda y la construcci\u00f3n y destaca las oportunidades digitales cruciales a lo largo del ciclo de vida de los activos. Eval\u00faa el impacto global de la transformaci\u00f3n tecnol\u00f3gica a trav\u00e9s de tres casos pr\u00e1cticos y explora las implicaciones para las partes interesadas.<\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[9],"info-country":[],"info-level":[15],"info-region":[],"info-type":[29],"info-state":[82],"class_list":["post-3822","info-collection","type-info-collection","status-publish","hentry","info-category-capability-capacity-building","info-level-global-level","info-type-evidence-and-analysis","info-state-justifying"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"2 March 2022","category_list":{"info-category":[{"term_id":9,"name":"Capability &amp; Capacity Building","slug":"capability-capacity-building","term_group":0,"term_taxonomy_id":9,"taxonomy":"info-category","description":"","parent":0,"count":152,"filter":"raw"}],"info-country":false,"info-level":[{"term_id":15,"name":"Global level","slug":"global-level","term_group":0,"term_taxonomy_id":15,"taxonomy":"info-level","description":"","parent":0,"count":90,"filter":"raw"}],"info-region":false,"info-type":[{"term_id":29,"name":"Evidence and Analysis","slug":"evidence-and-analysis","term_group":0,"term_taxonomy_id":29,"taxonomy":"info-type","description":"","parent":0,"count":70,"filter":"raw"}],"info-state":[{"term_id":82,"name":"Justifying","slug":"justifying","term_group":0,"term_taxonomy_id":82,"taxonomy":"info-state","description":"","parent":0,"count":107,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/capability-capacity-building\/\" alt=\"Capability &amp; Capacity Building\" class=\"info-category-capability-capacity-building\">Capability &amp; Capacity Building<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/global-level\/\" alt=\"Global level\" class=\"info-level-global-level\">Global level<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/evidence-and-analysis\/\" alt=\"Evidence and Analysis\" class=\"info-type-evidence-and-analysis\">Evidence and Analysis<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/justifying\/\" alt=\"Justifying\" class=\"info-state-justifying\">Justifying<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3822"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3822"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3822"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3822"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3822"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3822"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3822"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}