    {"id":3823,"date":"2022-03-02T15:32:00","date_gmt":"2022-03-02T15:32:00","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/el-valor-empresarial-de-bim-para-la-infraestructura-2017\/"},"modified":"2023-11-17T14:17:07","modified_gmt":"2023-11-17T14:17:07","slug":"el-valor-empresarial-de-bim-para-la-infraestructura-2017","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/el-valor-empresarial-de-bim-para-la-infraestructura-2017\/","title":{"rendered":"El valor empresarial de BIM para la infraestructura 2017"},"content":{"rendered":"<p>n 2012, Dodge D&amp;A public\u00f3 el primer Informe sobre el valor empresarial de BIM para la infraestructura &#8220;SmartMarket&#8221;. Las conclusiones del informe eran dos: BIM en infraestructura parec\u00eda llevar unos tres a\u00f1os de retraso con respecto al sector de la construcci\u00f3n, pero hab\u00eda muchos indicios positivos de que su uso estaba a punto de generalizarse. Los hallazgos de la actualizaci\u00f3n de 2017 demuestran claramente el cumplimiento de esa promesa. Destaca el valor que BIM aporta a propietarios, ingenieros y contratistas del sector de la infraestructura en Estados Unidos, Reino Unido, Francia y Alemania. Ofrece una visi\u00f3n completa de BIM para la infraestructura a trav\u00e9s de art\u00edculos que describen el uso de BIM en proyectos espec\u00edficos de carreteras, aeropuertos y ferrocarriles. Incluye el uso de BIM a lo largo del ciclo de vida de un activo y m\u00e1s all\u00e1, incluida la creaci\u00f3n de modelos de activos existentes para la planificaci\u00f3n y el uso de datos de los modelos para las operaciones y la gesti\u00f3n de activos. Los datos del estudio de la infraestructura de transporte en EE.UU., Reino Unido, Francia y Alemania incluyen: Los crecientes \u00edndices de implementaci\u00f3n entre los usuarios de BIM. Las ventajas de utilizar BIM, las inversiones realizadas para potenciar esas ventajas y su ROI percibido. La perspectiva de los no usuarios, incluidas sus actitudes hacia BIM y los factores que podr\u00edan impulsar su adopci\u00f3n. Desglose individual de los principales resultados en los cuatro pa\u00edses presentados.<\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[9],"info-country":[],"info-level":[15],"info-region":[],"info-type":[29],"info-state":[82],"class_list":["post-3823","info-collection","type-info-collection","status-publish","hentry","info-category-capability-capacity-building","info-level-global-level","info-type-evidence-and-analysis","info-state-justifying"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"2 March 2022","category_list":{"info-category":[{"term_id":9,"name":"Capability &amp; Capacity Building","slug":"capability-capacity-building","term_group":0,"term_taxonomy_id":9,"taxonomy":"info-category","description":"","parent":0,"count":152,"filter":"raw"}],"info-country":false,"info-level":[{"term_id":15,"name":"Global level","slug":"global-level","term_group":0,"term_taxonomy_id":15,"taxonomy":"info-level","description":"","parent":0,"count":90,"filter":"raw"}],"info-region":false,"info-type":[{"term_id":29,"name":"Evidence and Analysis","slug":"evidence-and-analysis","term_group":0,"term_taxonomy_id":29,"taxonomy":"info-type","description":"","parent":0,"count":70,"filter":"raw"}],"info-state":[{"term_id":82,"name":"Justifying","slug":"justifying","term_group":0,"term_taxonomy_id":82,"taxonomy":"info-state","description":"","parent":0,"count":107,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/capability-capacity-building\/\" alt=\"Capability &amp; Capacity Building\" class=\"info-category-capability-capacity-building\">Capability &amp; Capacity Building<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/global-level\/\" alt=\"Global level\" class=\"info-level-global-level\">Global level<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/evidence-and-analysis\/\" alt=\"Evidence and Analysis\" class=\"info-type-evidence-and-analysis\">Evidence and Analysis<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/justifying\/\" alt=\"Justifying\" class=\"info-state-justifying\">Justifying<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3823"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3823"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3823"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3823"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3823"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3823"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3823"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}