    {"id":3829,"date":"2022-03-02T16:13:00","date_gmt":"2022-03-02T16:13:00","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/productividad-de-la-infraestructura-como-ahorrar-1-billon-de-dolares-al-ano\/"},"modified":"2023-11-17T14:17:08","modified_gmt":"2023-11-17T14:17:08","slug":"productividad-de-la-infraestructura-como-ahorrar-1-billon-de-dolares-al-ano","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/productividad-de-la-infraestructura-como-ahorrar-1-billon-de-dolares-al-ano\/","title":{"rendered":"Productividad de la infraestructura: C\u00f3mo ahorrar 1 bill\u00f3n de d\u00f3lares al a\u00f1o"},"content":{"rendered":"<p>as\u00e1ndose en el trabajo de McKinsey &amp; Company con gobiernos y agentes del sector privado de infraestructura de todo el mundo, en una amplia revisi\u00f3n bibliogr\u00e1fica y en la informaci\u00f3n obtenida de m\u00e1s de 400 ejemplos de casos, este informe del McKinsey Global Institute (MGI) sostiene que si los propietarios de infraestructura de todo el mundo adoptaran las mejores pr\u00e1cticas probadas, podr\u00edan aumentar la productividad de la inversi\u00f3n en infraestructura y conseguir ahorros del 40%. La generalizaci\u00f3n de las mejores pr\u00e1cticas podr\u00eda ahorrar una media de 1 bill\u00f3n de d\u00f3lares al a\u00f1o en costos de infraestructura durante los pr\u00f3ximos 18 a\u00f1os. Un aumento de la productividad de esta magnitud es factible en muchos pa\u00edses si est\u00e1n dispuestos a invertir en un enfoque sistem\u00e1tico de la infraestructura que impulse la mejora en todos los organismos y en los propietarios y contratistas del sector privado. Este informe examina los retos de alto nivel en la entrega de infraestructura y c\u00f3mo pueden abordarse potencialmente. Los temas de acci\u00f3n incluyen la eliminaci\u00f3n del despilfarro, la mejora de la selecci\u00f3n de proyectos y la racionalizaci\u00f3n de su ejecuci\u00f3n. Tambi\u00e9n incluye ejemplos de buenas pr\u00e1cticas en todo el mundo, que supondr\u00edan una gran diferencia si se aplicaran a escala mundial. El informe se\u00f1ala tres estrategias que podr\u00edan ayudar a ahorrar: Optimizar las carteras de proyectos. Racionalizar la entrega. Aprovechar al m\u00e1ximo la infraestructura existente.<\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[9],"info-country":[],"info-level":[15],"info-region":[],"info-type":[29],"info-state":[82],"class_list":["post-3829","info-collection","type-info-collection","status-publish","hentry","info-category-capability-capacity-building","info-level-global-level","info-type-evidence-and-analysis","info-state-justifying"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"2 March 2022","category_list":{"info-category":[{"term_id":9,"name":"Capability &amp; Capacity Building","slug":"capability-capacity-building","term_group":0,"term_taxonomy_id":9,"taxonomy":"info-category","description":"","parent":0,"count":152,"filter":"raw"}],"info-country":false,"info-level":[{"term_id":15,"name":"Global level","slug":"global-level","term_group":0,"term_taxonomy_id":15,"taxonomy":"info-level","description":"","parent":0,"count":90,"filter":"raw"}],"info-region":false,"info-type":[{"term_id":29,"name":"Evidence and Analysis","slug":"evidence-and-analysis","term_group":0,"term_taxonomy_id":29,"taxonomy":"info-type","description":"","parent":0,"count":70,"filter":"raw"}],"info-state":[{"term_id":82,"name":"Justifying","slug":"justifying","term_group":0,"term_taxonomy_id":82,"taxonomy":"info-state","description":"","parent":0,"count":107,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/capability-capacity-building\/\" alt=\"Capability &amp; Capacity Building\" class=\"info-category-capability-capacity-building\">Capability &amp; Capacity Building<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/global-level\/\" alt=\"Global level\" class=\"info-level-global-level\">Global level<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/evidence-and-analysis\/\" alt=\"Evidence and Analysis\" class=\"info-type-evidence-and-analysis\">Evidence and Analysis<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/justifying\/\" alt=\"Justifying\" class=\"info-state-justifying\">Justifying<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3829"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3829"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3829"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3829"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3829"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3829"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3829"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}