    {"id":3835,"date":"2022-03-03T17:27:00","date_gmt":"2022-03-03T17:27:00","guid":{"rendered":"http:\/\/localhost:10023\/info-collection\/modelar-el-futuro-de-la-construccion-innovadores-inspiradores-redefinen-el-sector\/"},"modified":"2023-11-17T14:17:10","modified_gmt":"2023-11-17T14:17:10","slug":"modelar-el-futuro-de-la-construccion-innovadores-inspiradores-redefinen-el-sector","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/modelar-el-futuro-de-la-construccion-innovadores-inspiradores-redefinen-el-sector\/","title":{"rendered":"Modelar el futuro de la construcci\u00f3n: Innovadores inspiradores redefinen el sector"},"content":{"rendered":"<p>ste informe es la segunda publicaci\u00f3n del proyecto plurianual &#8220;El futuro de la construcci\u00f3n&#8221;, que orienta y apoya al sector de la ingenier\u00eda y la construcci\u00f3n en su actual transformaci\u00f3n (digital). El primer informe, &#8220;Shaping the Future of Construction: A Breakthrough in Mindset and Technology&#8221; (Modelando el futuro de la construcci\u00f3n: Un gran avance en mentalidad y tecnolog\u00eda), se present\u00f3 en mayo de 2016. En \u00e9l se describe el estado del sector, se eval\u00faan las tendencias mundiales pertinentes y su impacto en el sector, se insta a la acci\u00f3n a nivel empresarial, industrial y gubernamental y se esboza un marco integral de transformaci\u00f3n del sector con m\u00e1s de 30 medidas y mejores pr\u00e1cticas. Una de las principales conclusiones es que han surgido muchas innovaciones, pero a\u00fan no se han adoptado de forma generalizada. El segundo informe examina las posibles soluciones, extrayendo lecciones clave y recomendaciones en materia de pol\u00edticas de los principales innovadores y disruptores, centr\u00e1ndose en fomentar una adopci\u00f3n m\u00e1s amplia de la innovaci\u00f3n. Al describir c\u00f3mo los proyectos emblem\u00e1ticos han aplicado las innovaciones, muestra el potencial transformador de las innovaciones. Este informe presenta y analiza 10 casos de innovaci\u00f3n del programa Lighthouse -proyectos emblem\u00e1ticos destacados, as\u00ed como start-ups y proyectos piloto- que demuestran el potencial de la innovaci\u00f3n en la construcci\u00f3n y permiten vislumbrar el futuro del sector. Sus historias no s\u00f3lo sirven de inspiraci\u00f3n, sino que tambi\u00e9n describen claramente los retos habituales a los que se enfrentan los innovadores y muestran c\u00f3mo afrontarlos y superarlos.<\/p>\n","protected":false},"featured_media":0,"template":"","info-category":[9],"info-country":[],"info-level":[15],"info-region":[],"info-type":[29],"info-state":[82],"class_list":["post-3835","info-collection","type-info-collection","status-publish","hentry","info-category-capability-capacity-building","info-level-global-level","info-type-evidence-and-analysis","info-state-justifying"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"3 March 2022","category_list":{"info-category":[{"term_id":9,"name":"Capability &amp; Capacity Building","slug":"capability-capacity-building","term_group":0,"term_taxonomy_id":9,"taxonomy":"info-category","description":"","parent":0,"count":152,"filter":"raw"}],"info-country":false,"info-level":[{"term_id":15,"name":"Global level","slug":"global-level","term_group":0,"term_taxonomy_id":15,"taxonomy":"info-level","description":"","parent":0,"count":90,"filter":"raw"}],"info-region":false,"info-type":[{"term_id":29,"name":"Evidence and Analysis","slug":"evidence-and-analysis","term_group":0,"term_taxonomy_id":29,"taxonomy":"info-type","description":"","parent":0,"count":70,"filter":"raw"}],"info-state":[{"term_id":82,"name":"Justifying","slug":"justifying","term_group":0,"term_taxonomy_id":82,"taxonomy":"info-state","description":"","parent":0,"count":107,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-category":"<a href=\"https:\/\/globalbim.org\/news\/info-category\/capability-capacity-building\/\" alt=\"Capability &amp; Capacity Building\" class=\"info-category-capability-capacity-building\">Capability &amp; Capacity Building<\/a> ","info-level":"<a href=\"https:\/\/globalbim.org\/news\/info-level\/global-level\/\" alt=\"Global level\" class=\"info-level-global-level\">Global level<\/a> ","info-type":"<a href=\"https:\/\/globalbim.org\/news\/info-type\/evidence-and-analysis\/\" alt=\"Evidence and Analysis\" class=\"info-type-evidence-and-analysis\">Evidence and Analysis<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/justifying\/\" alt=\"Justifying\" class=\"info-state-justifying\">Justifying<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/3835"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=3835"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=3835"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=3835"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=3835"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=3835"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=3835"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=3835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}