    {"id":5843,"date":"2026-03-31T17:40:55","date_gmt":"2026-03-31T16:40:55","guid":{"rendered":"https:\/\/globalbim.org\/info-collection\/second-avenue-subway-bim-context\/"},"modified":"2026-03-31T17:40:59","modified_gmt":"2026-03-31T16:40:59","slug":"second-avenue-subway-bim-context","status":"publish","type":"info-collection","link":"https:\/\/globalbim.org\/es\/info-collection\/second-avenue-subway-bim-context\/","title":{"rendered":"Second Avenue Subway &#8211; BIM Context"},"content":{"rendered":"\n<p>City-defining infrastructure. Complex urban environment requiring sophisticated coordination. Budget $3.4B Phase 1, $3.4B Phase 2. Likely BIM applications based on project type: 3D underground alignment modeling, tunnel boring path coordination, station architectural\/MEP\/structural coordination, utilities conflict detection with dense existing infrastructure, geotechnical modeling, systems integration (signals, communications, traction power), construction sequencing maintain adjacent operations, as-built documentation integration existing subway systems. Project requires maintaining 100% service adjacent lines during construction. Advanced digital tools essential coordination dense urban underground environment. Total ~$6.8B investment Phases 1-2.<\/p>\n\n\n<p><a href=\"https:\/\/www.united-bim.com\/new-york-construction-trends-and-bim-impact\/\" target=\"_blank\" rel=\"noopener\"><\/p>\n\r\n\r\nMetropolitan Transportation Authority (MTA)","protected":false},"featured_media":0,"template":"","info-category":[],"info-country":[52],"info-level":[],"info-region":[24],"info-type":[],"info-state":[85],"class_list":["post-5843","info-collection","type-info-collection","status-publish","hentry","info-country-usa","info-region-north-america","info-state-implementing"],"acf":[],"aioseo_notices":[],"tpgb_featured_images":null,"tpgb_post_meta_info":{"get_date":"31 March 2026","category_list":{"info-category":false,"info-country":[{"term_id":52,"name":"USA","slug":"usa","term_group":0,"term_taxonomy_id":52,"taxonomy":"info-country","description":"","parent":0,"count":76,"filter":"raw"}],"info-level":false,"info-region":[{"term_id":24,"name":"North America","slug":"north-america","term_group":0,"term_taxonomy_id":24,"taxonomy":"info-region","description":"","parent":0,"count":85,"filter":"raw"}],"info-type":false,"info-state":[{"term_id":85,"name":"Implementing","slug":"implementing","term_group":0,"term_taxonomy_id":85,"taxonomy":"info-state","description":"","parent":0,"count":252,"filter":"raw"}]},"comment_count":0,"post_likes":0,"post_views":0},"tpgb_post_category":{"info-country":"<a href=\"https:\/\/globalbim.org\/news\/info-country\/usa\/\" alt=\"USA\" class=\"info-country-usa\">USA<\/a> ","info-region":"<a href=\"https:\/\/globalbim.org\/news\/info-region\/north-america\/\" alt=\"North America\" class=\"info-region-north-america\">North America<\/a> ","info-state":"<a href=\"https:\/\/globalbim.org\/news\/info-state\/implementing\/\" alt=\"Implementing\" class=\"info-state-implementing\">Implementing<\/a> "},"_links":{"self":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection\/5843"}],"collection":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/information-collection"}],"about":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/types\/info-collection"}],"wp:attachment":[{"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/media?parent=5843"}],"wp:term":[{"taxonomy":"info-category","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-category?post=5843"},{"taxonomy":"info-country","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-country?post=5843"},{"taxonomy":"info-level","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-level?post=5843"},{"taxonomy":"info-region","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-region?post=5843"},{"taxonomy":"info-type","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-type?post=5843"},{"taxonomy":"info-state","embeddable":true,"href":"https:\/\/globalbim.org\/es\/wp-json\/wp\/v2\/info-state?post=5843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}