Public Procurement Methodology Using BIM

Czech Agency for Standardisation

The obligation to use BIM when awarding public contracts for construction projects has not yet been made binding on the contracting authorities by legislation. The BIM Concept implies that from the so-called decisive date (originally 1 January 2022), contracting authorities awarding contracts will have above-limit public works contracts, including contracts for related pre-design and design services the obligation to award such a public contract using the BIM

The methodology in this document focuses mainly on defining the basic procurement processes so that they can be applied to BIM, considering effective cooperation within information models. Thanks to the methodological activities of the ?AS agency, the contracting authority will have a sufficient range of standards at its disposal, and cooperation processes within BIM will thus be built on a unified and standardsied basis .

https://www.koncepcebim.cz/uploads/inq/files/CAS_Metodika%20zadavani%20verejnych%20zakazek%20s%20vyuzitim%20BIM_Agentura%20CAS.pdf

Attention

The following content will be presented in English

Would you like to proceed?

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.