This report by buildingSMART is an official IFC Rail Project (Phase I) deliverable, referenced by the Requirement Analysis Report and Conceptual Model Report. It outlines the effort to extend the IFC schema to include the requirements of rail infrastructure. The document provides a detailed framework for incorporating these requirements into the IFC model, ensuring alignment with the rail industry’s specific needs.