ANNEX 3.1 – COMMON INFRABIM REQUIREMENTS, DRAFT 03/2019 (DATA EXCHANGE REQUIREMENTS FOR HANDOVER MATERIAL)

Details the minimum information at the handover phase on infrastructure projects

 

View this article:

https://drive.buildingsmart.fi/s/c5jX78gHo9mAQab?dir=undefined&openfile=5716

Attention

The following content will be presented in English

Would you like to proceed?

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.