BIM Execution Plan

Roads & Traffic Agency, Belgium
2020

The BIM Team of the Roads and Traffic Agency (Agentschap Wegen en Verkeer, AWV) is responsible for the elaboration of the necessary BIM engagement documents, such as the BIM protocol and the BIM execution plan. The BIM execution plan for infrastructure projects has been prepared thanks to the insights and information from the AWV’s BIM pilot projects. The Belgian BIM protocol, drawn up by the BIM & ICT Technical Committee of the Belgian Building Research Institute (BBRI), was also a source of inspiration in realising the BIM execution plan.

The BIM execution plan, focused on infrastructure projects, aims to provide practical guidelines for BIM adoption in projects. The general guidelines for a BIM-oriented collaboration are included in the AWV BIM-protocol; the project-specific BIM execution plan takes a closer look at the practicalities of BIM collaboration. The requirements, specifications and practical agreements in the BIM execution plan only apply on the specific project or contract. Typical of a BIM execution plan is also that the practical agreements can be further updated during the project, should this be necessary.

Read the Plan

Attention

The following content will be presented in English

Would you like to proceed?

This site is registered on wpml.org as a development site.